A more positive day today. Talked things over with the builder and the electrics from yesterday are making more sense now. The connections I thought were missing were just hiding. Though the electrician had gotten carried away and installed an extra double socket, which needs to be removed - otherwise it's going to be behind the radiator!
It's still off-centre but, as I think I said yesterday, that will actually work in our favour. Albeit with me having to make liberal use of my electric planer.
So, to today's action...
Insulation has been partially installed in the ceiling,
and some slabs have been laid - specifically a step has been added, slabs around the extension have been restored and a path at the side of the extension (through the swamp) has been restored. I couldn't get a picture of the side but you can see from this pic how much neater it looks already...
The step and new slabs are only temporary. They just maintain access until the garden project puts something more permanent in place.
That's it for today. The transformation continues apace tomorrow. See you then.
No comments:
Post a Comment