Day 17 and main guy is on his jollies. Left his assistant to lower the ground level inside the extension. This is to make room for the suspended concrete floor.
Able Assistant made good progress though the brickwork that existed prior to the conservatory really didn't want to shift. So he's worked hard today.
He also took the scaffolding down and, reassuringly, that let a lot more light in. So I'm really happy with the design so far.
I really need to get my arse into gear with the kitchen. I need to have some idea of suppliers and prices. I last did this a year or two ago but my goodness a lot has happened in the world since then!
No comments:
Post a Comment