We had 3 people on site today. The two builders and a plasterer.
To support the plasterer, a rudimentary floor was installed over the staircase. This allowed the plasterer to reach the ceiling using normal equipment. So yes, as you might have guessed from that intro, the ceiling of the new landing has been plastered.
I think there must have been a mishap at one point though as there's now orange streaks down one wall, underneath the new staircase...
And plaster-splatter all over the first floor landing...
It all scraped off fairly easily but it would have been nice to have been alerted to this issue.
Anyway, moving on, the builders seem to have been busy outside, fitting some more of the tiles to the dormer. At one point it was raining rubble on the new kitchen's roof but everything seems intact.